The Eruv of Monsey released its weekly inspection report ahead of Shabbos Parshas Toldos, with inspectors identifying 14 issues across the Eruv system. Six were determined to be not kosher and required immediate attention, one was classified as high-priority, and seven were listed as additional maintenance findings.
Despite heavy rain throughout Thursday, repair crews completed seven repairs, with officials confirming that all 24 sections across the Eruv’s 14 regions are kosher and operational for Shabbos.
In Pearl River, inspectors identified several issues throughout the area. Along Loescher Lane, a disconnected wooden lechi was reattached and secured. On South Highland Avenue, a tree branch was pressing against an Eruv wire, while on West Washington Avenue, an Eruv wire had become tangled with other wires and pulled out of alignment.
Three additional locations along Old Pascack Road required attention, including two areas where branches were pushing against Eruv wires and another where a PVC lechi had shifted out of alignment against a utility pole. Branches interfering with an Eruv wire were also identified along Summit Avenue.
In the Monsey Rambam Eruv, crews completed a significant infrastructure improvement along Route 306, permanently replacing approximately 60 feet of Eruv poles and strings behind a private property with strong panel fencing.
In the Spring Valley Rambam Eruv, crews trimmed branches touching the Eruv string along South Main Street and cleared the line.
In New City, crews repaired a broken PVC lechi along East Eckerson Road. On South Mountain Road, a utility pole that appeared to have been damaged by a vehicle caused a PVC lechi to break and an Eruv string to fall. Crews replaced the damaged lechi and restored the string.
In Hillcrest, crews trimmed branches along South Pascack Road that were pushing against an Eruv string.
The Suffern, Airmont, Chestnut Ridge, Montebello, Nanuet, Wesley Hills, New Hempstead, Pomona, and Haverstraw sections were also inspected and confirmed kosher.
Major Route 59 Eruv Infrastructure Upgrade Underway
In addition to the weekly repairs, Eruv crews began an important infrastructure upgrade along Route 59 near KJ Tiles and the New York State Thruway overpass.
The project involves installing two metal poles, one on each side of Route 59, with an Eruv string crossing the roadway and connecting to the Thruway fence. The upgrade is designed to establish an independent separation between the Spring Valley Rambam Eruv and the Airmont Eruv, strengthening the overall infrastructure.
Eruv officials expressed their appreciation to the dedicated checkers and repair crews who continued working throughout Thursday’s heavy rain to complete the necessary inspections and repairs ahead of Shabbos.
Due to the weather conditions, some lower-priority maintenance work and recommended infrastructure upgrades will be addressed next week.
Officials confirmed that all 14 regions and 24 sections of the Monsey Eruv are kosher for Shabbos Parshas Toldos.