Logo

Jooish

HomeSitesGroupsStatusPodcasts
Sign InSign Up
MonseyScoop

Monsey Eruv Weekly Inspection Report — Parshas Vayeitzei

Nov 20, 2026·3 min read

The Eruv of Monsey released its weekly inspection report ahead of Shabbos Parshas Vayeitzei, announcing that all 24 sections across its 14 regions are kosher following another week of repairs, maintenance, and major infrastructure improvements throughout Rockland County and surrounding areas.

According to the report, crews completed nine individually counted repairs, along with additional connecting-string repairs in Chestnut Ridge and major infrastructure upgrades in Suffern and Wesley Hills.

In Suffern, crews completed a significant upgrade along Hemion Road, replacing older half-inch PVC lechis with stronger, straighter 1-inch PVC lechis measuring 20 feet tall. The improvements are designed to strengthen the Eruv connection toward Good Samaritan Hospital. Inspectors also identified vines growing around PVC lechis along Franklin Turnpike.

In Airmont, two repairs were completed following utility pole work. Along South Airmont Road, crews installed a new PVC lechi after utility wires were transferred to a replacement pole. Another new PVC lechi was installed along Cragmere Road in New Jersey following additional utility pole work.

In Chestnut Ridge, crews repaired fallen connecting strings along Williams Avenue near the Garden State Parkway overpass, restoring the connection to the independently supervised Dexter Park Eruv.

In Montebello, crews replaced a broken and crushed PVC lechi in the Babbling Brook and Westgate area.

In Monsey, crews completed repairs along Maple Avenue near the Viznitz School, where a tree had been pressing against a chain-link fence between an Eruv pole and a white plastic fence. The tree was removed, and the leaning fence was repaired.

In Wesley Hills, crews completed another major infrastructure improvement along Old Route 202 and Route 202, upgrading the Eruv with straight, 20-foot, 1-inch PVC lechis. Additional PVC replacements were also completed along Route 202 near Route 306.

Five repairs were completed in Pomona along Call Hollow Road. Crews repaired a damaged PVC lechi, installed brackets to secure another PVC, corrected the alignment of a lechi beneath the Eruv wire, and replaced two additional PVC lechis that were damaged or improperly positioned.

The Pearl River, Spring Valley, Nanuet, New Hempstead, New City, Hillcrest, and Haverstraw sections were also inspected and confirmed kosher.

Additional Eruv Infrastructure Improvements

Beyond the regular weekly repairs, Eruv crews continued strengthening fencing and other infrastructure throughout the system.

The report documented repairs to fencing damaged by a major construction project, along with the installation of approximately 70 feet of new metal fencing secured with T-posts.

Crews also addressed damage caused by strong winds that pushed a large tree against a town-approved Eruv metal pole, affecting the alignment of the Eruv string. A professional tree removal company removed the tree to restore the proper alignment.

Important Montebello Eruv Boundary Reminder

Eruv officials issued an important reminder regarding the Babbling Brook and Westgate areas near Route 202.

Although the Babbling Brook area across Route 202 has a separate connection to the Montebello Eruv, not all properties in Westgate are included within the Eruv boundaries.

Residents are urged to verify that their properties and intended routes are within the Eruv before carrying on Shabbos and to consult the official Eruv map for accurate boundary information.

With all inspections and necessary repairs completed, officials confirmed that all 14 regions and 24 sections of the Monsey Eruv are kosher and operational ahead of Shabbos Parshas Vayeitzei.

View original on MonseyScoop
HomeSitesGroupsStatusPodcastsSign In